Three land lots with a total area of nearly 20,000 m² in Functional Zone 7 of the Thủ Thiêm New Urban Area will have their 1:2,000 subdivision plan partially adjusted, changing the land use function of the three lots to residential land to serve the resettlement of households in the 4.39 ha area.
On July 28, the District 2 People's Committee, together with the Thủ Thiêm New Urban Area Investment and Construction Management Board, held a conference to publicly announce the partial adjustment of the 1:2,000 subdivision plan and the adjustment of the 1:500 detailed plan for 3 land lots (designated 7-5, 7-9 and G9) in Functional Zone 7 of the Thủ Thiêm New Urban Area, and 2 lots (designated III – HH8 and III – CC1) in the 296.4 ha urban renovation area adjacent to the Thủ Thiêm New Urban Area, which had previously been approved by the City People's Committee.
Specifically, Site No. 1 has a total area of 4,247.8 m², consisting of the lot designated 7-5 (designated P4 in the 38.4 ha residential area of Bình Khánh Ward) at 4,119.0 m², and the land adjoining lot 7 – 5 and the road boundary of Lương Định Của Street at 128.8 m².
Site No. 2 has a total area of 11,962.6 m², consisting of the lot designated 7 – 9 (designated P5 in the 38.4 ha residential area of Bình Khánh Ward) at 9,226.0 m², and the lot designated III – HH8 in the 294.6 ha urban renovation area adjacent to the Thủ Thiêm New Urban Area at 2,736.6 m².
Site No. 3 has a total area of 3,630.6 m², consisting of the public park lot (designated G9 in the 38.4 ha residential area, Bình Khánh Ward) at 1,224.6 m², the lot designated III – CC1 in the 294.6 ha urban renovation area adjacent to the Thủ Thiêm New Urban Area at 2,201.0 m², and the land adjoining lots G9 and III – CC1 at 205.0 m².
The content of the partial plan adjustment covers land use functions and urban planning land use indicators, such as changing the land use function of the 3 sites to the residential land group to serve the resettlement of households in the 4.39 ha area in Bình An Ward, and setting planned land use indicators for each construction lot in line with current regulations, standards and rules for attached row houses.
According to Cafef