To prepare the application for a housing construction permit, you must calculate the construction floor area in order to estimate construction costs. So how is the construction floor area in a building permit calculated?
Under national technical regulation QCVN03:200/BXD on the classification and grading of construction works and urban technical infrastructure, the construction floor area in a building permit is defined as follows:
– The floor area of one story is the floor area within the outer edge of the enclosing walls of that story, including corridors, loggias, balconies, etc.
– Total construction floor area is the total area of all stories, including the basement, semi-basement, technical floor and roof floor.
Normally the permitting authority counts only usable floor area. Extra areas outside the house, such as skylight wells, terraces and balconies, are not counted in the permit. So when calculating construction costs, you need to keep this in mind so you do not lose money on those extra parts.
How to calculate construction floor area in a building permit
Where:
Construction floor area
– Add 30–50% of the cost of one floor in the case where the concrete has already been poured and a tiled roof is added afterwards.
– Areas with a roof above are counted at 100% of the area
– Areas without a roof but with floor tiling are counted at 50% of the area
– For voids inside the house, those under 4 m² are counted like a normal floor; over 4 m² are counted at 70% of the area; 8 m² and above are counted at 50% of the area.
Reinforcement of weak soil
– Counted at 20% of the area for the reinforced concrete pouring method
– In addition, depending on soil conditions and construction, different types of reinforcement will be chosen, such as using timber or steel reinforcement.
Foundation
– Counted at 30% of the area for a single footing.
– Counted at 35% of the area for a pile cap on reinforced concrete piles or bored piles.
– Counted at 50% of the area for a strip foundation
Basement (calculated separately from the foundation)
– Counted at 150% of the area for a basement with a depth of less than 1.5 m relative to the top of the basement ramp
– Counted at 170% of the area for a basement with a depth of less than 1.7 m relative to the top of the basement ramp
– Counted at 200% of the area for a basement with a depth of less than 2.0 m relative to the top of the basement ramp
– For a basement with a depth of more than 3.0 m relative to the top of the basement ramp, it is calculated according to its own specific characteristics
Yard
– Counted at 50% of the area when the yard is over 40 m² and has poured columns, ground beams, a boundary wall and floor tiling
– Counted at 70% of the area when the yard is under 40 m² and has poured columns, ground beams, a boundary wall and floor tiling
– Counted at 100% of the area when the yard is under 20 m² and has poured columns, ground beams, a boundary wall and floor tiling
Roof
– Counted at 50% of the roof area when the roof is poured reinforced concrete without tiling, and 60% of the roof area when it has tiling.
– Concrete with attached roof tiles is counted at 85% of the sloped roof area
– A tiled roof on a steel truss is counted at 60% of the sloped roof area
– Counted at 30% of the roof area for a corrugated metal roof.
Suppose a plot of 60 m² is built with a ground floor and 1 upper floor, with a poured concrete roof
Then: + Foundation area = 30% of the ground floor area = 18 m²
+ Ground floor area = first floor area = 60 m²
+ Concrete roof = 50% of the ground floor = 30 m²
>> Total construction area = Foundation + Ground floor + Upper floor + Roof = 18+60+60+30 = 168 m²
According to CafeLand